PIDA Projects Performance Dashboard 2022-2025

Programme for Infrastructure Development in Africa
Default performance calculation: 2022 → 2024

Dashboard Overview

About This Dashboard

This dashboard tracks the implementation progress of PIDA projects across sectors, displaying performance metrics based on the 2022 → 2024 interval by default. It shows project stages (with counts), global performance scores, and performance breakdowns.

Performance Score Formula: ((Improved + 0.5 × Same) / (Improved + Same + Declined)) × 100.

How to Use
  • Use the dropdown filters to narrow projects by Sector, Status, REC, or Region.
  • Click on any project row to view detailed information and the implementation timeline.
  • The progress indicators (green ✓, orange −, red ×) reflect changes in project stages.
  • Click on a sector card to instantly filter projects by that sector and view its performance.
  • Express Interest or share project details via the provided buttons.
Global Performance Score

The Implementation Performance score indicates how effectively projects advance. A high score (green) means strong progress, while lower scores (orange/red) indicate projects that have stalled.

Improved (28)
Same (27)
Declined (0)
Formula: ((Improved + 0.5 × Same) / Total with status) × 100
Project Implementation Stages:
S0 Enabling Environment 4
S1 Project Definition 6
S2A Pre-Feasibility 19
S2B Feasibility 21
S3A Project Structuring 8
S3B Transaction Support 3
S4A Implementation - Tendering 4
S4B Implementation - Construction 3
Filter Projects
Total Projects
68
Projects Advancing
28 +41%
Countries Involved
60
Implementation Performance
75%
Low Medium High
28 27 0
Performance Breakdown
28 27 0
Transport
27
(40% of projects)
Performance: 72%
11 14 0
Water
14
(21% of projects)
Performance: 68%
5 9 0
Energy
16
(24% of projects)
Performance: 88%
12 4 0
ICT
11
(16% of projects)
Performance: 0%
0 0 0
Project Name Sector Sub-Sector Development Stage Progress Status 2020 Status 2022 Status 2024 Cost (USD M) Investment Ask (USD M)
Abidjan -- Ouagadougou -- Niamey -- Cotonou -- Lomé Regional Rail Loop Project Transport Railway Infrastructure Project Definition S1 S2A 9,600.00 150.00
Abidjan-Lagos Corridor Highway Development Project Transport Highway Infrastructure Feasibility Stage S2A S3A 15,600.00 500.00
Akagera River Transport Transport Water Transport Feasibility Stage S2A S2B 180.00 65.00
Angololo Multipurpose Water Resources Development Project Water Multi-purpose Water Resources Project Structuring S2B S3A 136.00 0.85
Baynes Hydropower Project Energy Hydropower Feasibility Stage S2A S2B 1,512.00 0.00
Beira Port Development Transport Port Pre-Feasibility Stage S2A S2A 450.00 90.00
Bousalemn Highway in Tunisia at the Algerian Border Transport Highway Infrastructure Transaction Support S3A S3A 81.47 40.00
Construction of 287 MW Ruzizi IV Hydropower Project Energy Hydropower Pre-feasibility S2A S2A 712.00 0.00
Construction of 287 MW Ruzizi IV Hydropower Project Energy Hydropower Pre-feasibility S2A S2A 712.00 0.00
Construction of a Bridge over the Oubangui River Transport Road Infrastructure Pre-Feasibility S2A S2A 215.00 85.00
Construction of a Petroleum Jetty and Associated Storage Facilities at Albion Transport Port Infrastructure Feasibility S2A S2B 385.00 180.00
Construction of Amilcar Cabral Submarine Cable System ICT Submarine Cable Financial Structuring - S3A 74.50 0.00
Construction of Standard Gauge Railway from Mtwara/Mbamaba - Liganga to Mchuchuma Transport Railway Infrastructure Pre-Feasibility S2A S2A 2,150.00 75.00
Construction of Standard Gauge Railway: Mombasa -- Nairobi -- Malaba -- Kampala -- Kigali line Transport Railway Infrastructure Financial Close S3B S4A 13,800.00 5,200.00
Construction of the Central Corridor Standard Gauge Railway Transport Railway Infrastructure Financial Close S3B S4A 7,500.00 3,200.00
Construction of the Dam and Development of the Palambo Hydroelectric Plant Water Multi-purpose Dam Feasibility stage S2B S2B 0.00 10.00
Continental Africa Water Investment Support Programme (AIP) Water Transboundary Water Investment Project Definition S0 S1 S1 1,860.00 0.00
Continental High-Speed Railway Network - Initial Segment Transport Railway Infrastructure Enabling Environment - S0 6,500.00 185.00
Continental Seamless Airspace in Africa in the Context of SAAT Transport Air Transport Pre-Feasibility S2A S2A 420.00 85.00
Dawa River Multi-purpose Dam Water Multi-purpose Dam Project Definition S1 S1 603.50 0.00
Development of Data Centre Infrastructures Underpinning the Digital Economy ICT Data Centers Enabling Environment and Needs Assessment - S0 92.50 0.00
Development of the Booue and Tsengue-Leledi Hydroelectric Sites and Associated Transmission Lines Energy Hydropower Feasibility S2A S2B 950.00 120.00
Development of the Chollet Hydroelectric Site and Associated Transmission Lines Energy Hydropower Feasibility S2A S2B 1,200.00 150.00
Doubling of the RN06 between Mascara and Bechar and the RN50 between Bechar and the Algerian-Mauritanian Border Transport Road Infrastructure Financial Close S4A S4A 1,850.00 320.00
Eastern Africa Green Power Transmission Network Project 6 - Guba (Ethiopia)-Khartoum (Sudan) Energy Transmission Feasibility S2A S2B 850.00 325.00
Eastern Africa Green Power Transmission Network Project 6 - Guba (Ethiopia)-Khartoum (Sudan) Energy Transmission Feasibility S2A S2B 850.00 325.00
Egypt and Sudan Electrical Grid as the First Stage of the Continental Electrical Interconnection Energy Transmission Feasibility S1 S2B 2,200.00 0.00
El Fasher -- Kabkabiya -- El Geneina -- Adre Road Corridor Transport Road Infrastructure Financial Close S4A S4A 295.00 0.00
Establishment of a Navigational Line between Lake Victoria and the Mediterranean Sea (VICMED) Transport Water Transport Pre-Feasibility S2A S2A 1,250.00 45.00
Extension of National ICT Broadband Backbone (NICTBB) to DRC ICT Fiber Optic Pre-feasibility - S2A 4.00 0.00
Extension of National ICT Broadband Backbone (NICTBB) to Mozambique ICT Fiber Optic Pre-feasibility - S2A 60.00 0.00
Feasibility and In-depth Studies on the Development of Lake Chad Water Water Resource Management Feasibility Stage S1 S2B 21.60 0.00
Fomi Multipurpose Dam Development Project Water Multi-purpose Dam Feasibility Stage S2B S2B 55.20 0.00
Highway Linking the Terminal Part of the Fez-Oujda Highway to the Algerian East-West Highway Transport Road Infrastructure Pre-Feasibility S2A S2A 145.00 60.00
Implementation of an ECOWAS Regional Internet Exchange Points ICT Internet Exchange Project Definition - S1 0.30 0.00
Integration of Electrical Networks between Inga-Cabinda and Pointe Noire Energy Transmission Transaction Support & Financial Close S2B S3B 420.00 180.00
Integration of Electrical Networks between Inga-Cabinda and Pointe Noire Energy Transmission Transaction Support & Financial Close S2B S3B 420.00 180.00
Interconnection of Member States' Broadband Networks ICT Broadband Networks Project Definition - S1 0.30 0.00
Interconnexion des Réseaux Électriques en HTB entre le Gabon et la Guinée Equatoriale Energy Transmission Pre-Feasibility S1 S2A 343.00 0.00
Juba - Nairobi Fiber Optic Link ICT Fiber Optic Feasibility Stage - S2B 45.00 0.00
LAPSSET Crude Oil Pipeline Energy Oil & Gas Project structuring/Project Definition S1 S1 0.00 0.00
LAPSSET Railway Project Transport Railway Infrastructure Feasibility Stage S2A S2A 12,000.00 150.00
Lesotho Highlands Water Project Phase II Water Water Transfer Construction S4B S4B 2,600.00 0.00
Lesotho-Botswana Water Transfer Project Water Transboundary Water Resource Management Feasibility Stage S2B S2B 2,530.00 250,000.00
Libyan Alternative Freeway Transport Road Infrastructure Project Structuring S3A S3A 2,850.00 120.00
Luapula Hydropower Project Energy Hydropower Feasibility S2B S2B 1,750.00 450.00
Maritime Link Between the Comoros Islands Transport Port Project Structuring S3A S3A 88.00 48.00
Masaka - Mwanza Transmission Line Project Energy Electrical Transmission Project Structuring S2B S3A 561.00 0.00
Masaka - Mwanza Transmission Line Project Energy Electrical Transmission Project Structuring S2B S3A 561.00 0.00
Mobilisation and Transfer of Water from Bria Dam to Lake Chad Water Water Transfer Pre-Feasibility S2A S2A 25.60 0.00
Modernisation of the RN01 (Trans-Saharan) between Ghardaia and Tamenrasset Transport Road Infrastructure Under Construction S3A S4B 1,250.00 0.00
Noordoewer/Vioolsdrift Dam Water Water Resource Development Feasibility stage S2B S2B 501.50 1.50
Noumbiel Multipurpose Dam Water Multi-purpose Dam Pre-feasibility S2A S2B 169.00 0.00
Operationalisation of São Tomé and Príncipe Hydrometric Stations Water Water Resource Management Feasibility Stage S2A S2B 1.50 0.00
Praia-Dakar Shipping and Maritime Services Project Transport Maritime Transport Feasibility S2A S2B 175.50 45.00
Praia-Dakar-Abidjan Multimodal Transport Corridor Transport Road Pre-Feasibility Stage S2A S2A 975.00 35.20
Project for the Construction of the Bridge Over the Ntem River Transport Road Infrastructure Under Construction S3A S4B 75.00 0.00
Proposed 400kV Uganda-Tanzania Interconnector Project Energy Transmission Feasibility Stage S2A S2B 686.37 372.26
Rehabilitation and Creation of Cross-border Centres as Multi-Service Logistics Zones Transport Border Infrastructure Feasibility S2A S2B 185.00 55.00
Rehabilitation, Modernisation and Improvement of the Services of the Trans-Maghreb Railway Line Transport Railway Infrastructure Project Definition S1 S1 1,250.00 125.00
Rihaid El Birdi -- Om Dafug Road Corridor Transport Road Infrastructure Feasibility S2A S2B 175.00 75.00
SADC Regional Carrier-Neutral Data Centre ICT Data Centers Enabling Environment - S0 10.00 0.00
Sudan Section of the Fiber Optic Connectivity Component ICT Fiber Optic Pre-feasibility - S2A 55.00 0.00
Trans-African Highway Missing Links Program Transport Road Infrastructure Pre-Feasibility - S2A 4,200.00 250.00
Trans-Saharan Optic Fibre Broadband Project ICT Fiber Optic Pre-feasibility - S2A 4,500.00 0.00
Transborder Submarine Fiber PoPs, Regional Smart Hub Facility and Data Centre ICT ICT Infrastructure Transaction Support & Financial Close - S3B 70.00 0.00
Using Solar and Wind Energy to Extract Groundwater in Pastoral Wells Water Ground Water Management Enabling Environment and Needs Assessment S0 S0 0.40 0.00
Water Supply Project in Antanambao Manampotsy Water Water Supply Pre-feasibility S1 S2A 88.00 0.00